Short Description:


  • Processing air volume: 50L/h
  • Inlet pressure: ≤2MPa
  • Membrane and membrane module: φ85*1150, with built-in anti-static deflector net
  • Vacuum pump: explosion-proof, and membrane performance matching
  • Operating pressure:: ≤0.7MPa
  • Operation mode: manual operation
  • Piping and valve parts: pressure-resistant, corrosion-resistant, 304 as the main.
  • Feeding mode: continuous feeding
  • Device control: manual valve to control the device process
  • Product Detail

    Product Tags

    Process flow of the device

    The gas from the cylinder firstly enters into the buffer tank for preliminary gas-liquid separation, and at the same time regulates and stabilises the gas volume.
    The gas from the cylinder firstly enters the buffer tank for preliminary gas-liquid separation, and at the same time regulates and stabilises the gas volume without being affected by the fluctuation of the incoming gas volume. Non-condensable gas into the oil and gas recovery membrane module, the membrane through the side of the vacuum way back to the buffer tank front-end coupling process, the seepage side of the poor gas concentration is greatly reduced, seepage side into the adsorption column, adsorption column and membrane permeability measurement of the common use of a vacuum pump, as a variable pressure desorption, desorption of the gas back to the buffer tank, desorption column by the desorption of the exhaust gas discharged into the atmosphere.

    Device operation process

    Basic requirements: familiar with the process, understand and familiar with the function of each valve and components. Understand and be familiar with the opening of the software.
    First access to the gas mixing tank and check whether the gas connection is intact, and then access to the electrical components of the power supply, in strict accordance with the process flow sequential order of manipulation and set up, in the control or device operating state, such as the occurrence of gas leakage or sudden power outage should be the first to turn off the power supply and the various channels of the valve, the detection of leakage of the gas circuit sealing treatment. When the experimental device to complete the test should be closed after the total gas line valve and then cut off the power supply, check the gas tank and ensure that the gas is completely discharged. The device should be working for a long time should be dedicated staff supervision.
    When there are some simple problems customers can try to make their own solution, but based on the
    However, due to the diversity and complexity of the problems, we still hope that the customer can communicate with us in time, through our engineers to guide to complete the change of the data.

    Maintenance and Cleaning
    In the process of using the device, we should pay attention to the maintenance and cleaning of the device, which can not only keep the device neat and clean, but also keep the device clean.
    This will not only keep the device clean and tidy, but also increase the usefulness of the device.