Laboratory reaction kettle in the placement period, must use warm water to container inside and outside the wall of the comprehensive cleaning, catalyst evaluation device manufacturers often swept wash pot body, adhere to the reaction kettle appearance clean and bright liner, so as to achieve the purpose of the enduring!
Customised high pressure reactor should be replaced every six months during the placement of the reactor electric heating medium oil.
Reducer lubrication oil if there is a lack of time should be immediately replenished.
Fourth, the reactor jacket and lid parts of the safety valve, catalyst evaluation device manufacturers pressure gauge, temperature gauge, distillation hole, electric heaters, electrical appearance and so on should be regularly inspected, if there is a failure in time to replace or repair.
Post time: Mar-06-2025